Docs / 08-transformation/04-departments/_index
Department Transformation Plans — Hub
Entry point to the 15 per-department AI-transformation plans, with pilot-wave assignments and the shared 12-month rhythm.
Department Transformation Plans
One plan per department. Each plan translates the company-wide strategy (strategic transformation report) into that department’s operating reality at PRIME PRODUCTS — a deadline-driven ship supplier with bonded warehouses, tender business, and tens of thousands of SKUs.
How to read a department plan
Every plan uses the same section skeleton so plans aggregate cleanly into the program view:
- Current state (assumptions to validate) — what the department does today, systems, pain points. Everything here is an input to discovery interviews (requirement analysis framework); validated findings become entries in the requirements register.
- Target AI-first operating model — how the department works at M12.
- AI use cases — the candidate list feeding the AI use-case pipeline.
- Process transformation opportunities — redesign, not just assist.
- Data sources / agents / automations / integrations — agents must match the AI agent registry; integrations reference M365 + SoftOne integrations and the architecture overview.
- KPIs — aligned with the layers of the KPI framework. Baselines are captured in discovery; all show “TBD” until then.
- Risks, training needs, deliverables, milestones — training aligns with the change management and training plan; milestones align with the 12-month roadmap.
The shared 12-month rhythm
All departments follow the same macro-cadence; the pilot month varies by wave.
- M1–M3 — Discovery: interviews, process mapping, data-source inventory, requirement capture. Every department goes through this.
- M4 — Platform ready: on-prem LLM assistant live for all ~50 daily users; baseline training.
- M5–M8 — Pilots: each department runs its lead use case as a pilot in its assigned wave (wave 1 = M5, wave 2 = M7, wave 3 = M9 start).
- M9–M12 — Rollout & agents: successful pilots become standard practice; approved agents go to production with human approval points; KPIs measured against M12 targets.
Wave assignment logic: wave 1 takes knowledge-heavy, low-operational-risk departments where a drafting assistant cannot break physical operations; wave 2 takes transaction-heavy departments once SoftOne read integration is stable; wave 3 takes departments whose use cases depend on wave-1/2 outputs or on sensitive data handling being proven.
Department summary
| Department | Plan | Impact | Lead AI use case | Pilot wave |
|---|---|---|---|---|
| Executive Management | plan | High | KPI narrative briefing & board-pack drafting | Wave 2 (M7) |
| Sales | plan | High | RFQ-to-quote drafting from vessel requisitions | Wave 1 (M5) |
| Procurement | plan | High | Supplier quote comparison & PO drafting | Wave 2 (M7) |
| Logistics | plan | High | Delivery/berth coordination & customs-doc pre-fill | Wave 2 (M7) |
| Warehouse | plan | High | Pick-list optimization against sailing deadlines | Wave 3 (M9) |
| Finance | plan | High | Receivables-chasing drafts & cash-flow commentary | Wave 2 (M7) |
| Accounting | plan | Medium | Invoice/document matching assistant | Wave 3 (M9) |
| Human Resources | plan | Medium | Policy Q&A and onboarding assistant | Wave 3 (M9) |
| Customer Service | plan | High | Bilingual email triage & draft replies | Wave 1 (M5) |
| Marketing | plan | Medium | E-commerce product-content generation | Wave 3 (M9) |
| Technical Support | plan | Medium | Product/technical Q&A over manuals & datasheets | Wave 1 (M5) |
| IT | plan | High | Platform operations copilot & integration runbooks | Wave 2 (M7) |
| Compliance & Quality | plan | High | SOP drafting & audit-prep evidence collection | Wave 2 (M7) |
| Administration | plan | Medium | Correspondence drafting & document filing assistant | Wave 3 (M9) |
| Business Intelligence | plan | High | Natural-language querying over SoftOne | Wave 2 (M7) |
Related
- 12-month roadmap — program-level view of the same waves.
- AI agent registry — canonical list of the agents named in these plans.
- Requirements register — where validated department needs are recorded as REQ-NNN.