PRIME PRODUCTS · MISSION CONTROL
AI-first transformation · by TPL · vanos.tpl.one

Docs / 08-transformation/09-commercial/_index

Commercial Area

Hub for TPL-side commercial structure of the PRIME PRODUCTS transformation — stage/offer design. Internal-sensitive.

type: index updated: 2026-07-11 owner: kotsalidis

09 — Commercial

TPL-side commercial design for the PRIME PRODUCTS transformation. Internal-sensitive: this area describes how TPL structures, prices, and gates its offer. Figures are €[X] placeholders until each stage is individually priced and issued (Stage 1 priced 2026-07-03; the REQ-014 pilot priced 2026-07-11); the structure itself is not for circulation outside the TPL project team without partner approval.

Documents

DocumentWhat it is
stage-offer-structure.mdThe eleven-stage offer: objectives, scope, deliverables, timelines, client participation, acceptance criteria, dependencies, pricing/payment placeholders. Drafted to be lift-able into a client proposal.
offer-stage1-requirement-analysis.mdOffer TPL-PRIME-2026-001 — the priced Stage-1 (Discovery & Requirement Analysis) offer: €59,075 fixed fee (15% program-launch discount) with full effort-based rationale, full TPL C-suite committed. Signed-copy master: PDF.
offer-pilot-email-order-desk.mdOffer TPL-PRIME-2026-002 — the priced pilot offer (REQ-014, cylinders email-order desk): €51,000 fixed fee (15% program-launch discount) for discovery + build + 4-week supervised run with measured time-to-close results; effort-based rationale, 89 person-days. Draft — pending TPL C-suite review.

Principles (summary — full version in the offer doc)

  • Stage-gated: each stage has concrete acceptance criteria; the client can pause between stages.
  • Each stage independently valuable: no stage’s value depends on buying the next one.
  • Hardware is pass-through procurement at cost, not a TPL margin line.